
| 
Properties
Tilley
Activity Highlights
- Throughout 2005, production from the Tilley
oil pool was processed at a Gentry-operated
battery which came onstream early in the year.
Throughput averaged 800 boe/d.
- Two water injection wells and one water disposal
well were added to the battery facilities to maximize
pool productivity and efficiency.
- Two infill oil wells were drilled in 2005.
|  |  |