Properties

Tilley  

Activity Highlights

    Click Here to enlarge map.
    Tilley Map
  • Throughout 2005, production from the Tilley oil pool was processed at a Gentry-operated battery which came onstream early in the year. Throughput averaged 800 boe/d.
  • Two water injection wells and one water disposal well were added to the battery facilities to maximize pool productivity and efficiency.
  • Two infill oil wells were drilled in 2005.